Rawdat Residential Building, Abu Dhabi, U.A.E.

Project Information
  • Year : 2015
  • Architect: Mostafa Shorrab Part of APG design team
  • Engineer:
  • Contractor: –
  • Owner:  –
  • Area :1300 m2
  • Other info: –
  • BIM: Modelling + Parametric Screen

This is a closed competition project, the purpose of the project is to design a G+6 residential project. the main concept was to maximise the space utilisation to increase the sellable area. while in Elevations the mixture between the modern and the traditional visual features.

Swissôtel Al-Jaddaf, Dubai

Project Information

  • Location: Plot H1, al-jaddaf, Dubai, U.A.E
  • Architect: APG
  • Owner: aabar properties
  • Area : 44,500 m2
  • BIM:  3D modeling for elevation development design modifications studies

Role in Project

As part of the APG design development team, I was responsible of preparing the construction documents and details. Meanwhile the client required some design modifications. Thus beside preparing the drawings, a 3D modeling is required to develop the elevations and to implement new designs with total coordination.

  • Design development and details
  • Design Modification
  • Preparing the required submission
  • attend design workshops and client’s meeting