H02 Hospital Dr. Sótero del Río

Project Information

  • Location: Santiago, Chilie
  • Architect: Carvajal + Casariego
  • Engineer: Lynka
  • Contractor: Sacyr
  • Owner: Minestry of health – Chilie
  • Area : 213.000 m2
  • Other info: 725 Beds
  • BIM: LOD 300

Role in the Project

As part of the engineering BIM team, I was responsible of some basic tasks such as;

  • modeling of all disciplines mainly electrical.
  • Creating, modifyig MEP families and annotations.
  • Work on collaboratively using both Autodesk BIM360 and Revit sever.
  • Preparing plans and deliveries including export in formats (IFC, NWC … etc.)
  • Using Navisworks to review and coordinate the model.

and occasionally Advanced tasks included

  • preparing and modify Dynamo scripts implementing nodes and Python performing the following;
    • parameterize families.
    • import, export and linking data to excel.
    • selective annotation and its adaptation between scales.
    • automate measurements.
  • adapt and modify the Company’s plugins (C # adaptation).
  • Implement new methodologies to automate measurements.
  • train colleagues on these new methodologies.
  • Navisworks – Clash detection report.
  • Review the weekly models received from the architect and mark the modifications.